---
title: "Turbine Inspection Records | Papertrail"
description: "Statutory inspection, maintenance and certificate records for every turbine-mounted safety component, aligned to LOLER, PUWER and PSSR. Start for free."
canonical: https://www.papertrail.io/modules/turbine-inspections
last_updated: 2026-10-20
---

# Statutory records for every turbine-mounted safety component

Schedule the statutory inspection, the maintenance and the certificate for every
turbine-mounted safety component, all against one record. Each component runs its own schedule
against LOLER, PUWER or PSSR, whichever applies to it, so a busy quarter on one turbine doesn't mean
a missed check on another.

No credit card required.

Trusted by Teams Worldwide

RWE · BladeBUG · Glacier Energy

## Every turbine-mounted safety component, inspected on its own schedule

1. **A statutory inspection slips through the gaps.** A turbine carries dozens of safety components,
   each on its own interval, and a spreadsheet doesn't flag which one is due this week.
2. **A fault found on inspection has nowhere to go.** Without a task attached to the record, a
   defect noted during one visit is easy to lose before the next.
3. **An auditor asks for one unit's history, and the answer means a filing-cabinet search.**
   Certificates scattered across email and folders aren't evidence you can produce on the day it's
   asked for.

## Every turbine-mounted component, on its own inspection clock

| Feature | Card copy |
| --- | --- |
| Inspection Records For Every Component | See the inspection history, maintenance record and certificates for every turbine-mounted component in one place, not scattered across separate systems. |
| A Schedule For Every Component | Set the inspection interval for each turbine-mounted component individually, so you get a reminder before a check falls due rather than finding out after. |
| Maintenance Tasks, Assigned And Tracked | Turn a defect found on inspection into a task: assign it, track it to close, and see its progress against the record it came from. Task Manager is an add-on, not included in a free trial. |
| Certificates Built From Your Checklist | Checklists aligned to LOLER, PUWER and PSSR, or build your own with the Checklist Editor on Expert and Enterprise. Every completed checklist produces a certificate, filed against the component automatically. |

## Used across wind and renewables operations

Turbine-mounted safety equipment is one part of what a wind operator records in Papertrail. See the
[Renewables industry page](https://www.papertrail.io/industries/renewables) for staff competency, incident reporting and
site-wide compliance, alongside the safety equipment mounted on the turbine itself.

## Your turbine safety records, visible to whoever needs them

- **Invite** Invite the site operator or the specialist contractor who carries out your turbine rope-access
  and height inspections into a PartnerHub partnership
- **See** They see the live record in their own workspace, with its full history from creation onwards, not
  a certificate emailed after the last visit
- **Updates** Every new inspection, activity and task on a shared record appears automatically for everyone
  with access
- **Withdraw** Withdraw access at any time: they keep a read-only copy of the record as it stood, with no
  further updates

## Every turbine-mounted component, inspected to the right rules

`LOLER`

Different equipment on a turbine falls under different regulations. The service lift carries people,
so LOLER regulation 9 requires a thorough examination at least every 6 months, and a davit crane
lifting loads needs one at least every 12. Fall-arrest anchors come under the Work at Height
Regulations 2005.

In Papertrail, each component can have its own record and schedule. Your inspection contractor can see
what's due on a turbine before they climb it and record the inspection in the nacelle, even with no
signal.

ISO 27001 Certified · Capterra 4.7 · Software Advice · GetApp

**Read about our security** → [/security](https://www.papertrail.io/security)

### Will my team actually adopt it?

Papertrail is built around the inspection your
team already does: scan a tag, work through the checklist, save. RWE's technicians are working in it
after a half-hour session, and Hogan Group runs it across a team aged 18 to 79 on minimal training.
When questions come up, our support team's average first response time is under 8 minutes.

### Can you migrate us from spreadsheets or another system?

Our team handles the data migration for you, so your turbine safety register is ready to work with
rather than waiting on you to key it in. We set up your folder structure, frequencies and states with
you first, and help bring your existing component records and certificates across from a spreadsheet
or your current system.

### How often does LOLER require a thorough examination for turbine-mounted lifting equipment?

It depends on what the component is used for. LOLER Regulation 9 sets a 6-month interval for lifting
equipment and accessories used to lift people, and for lifting accessories generally, and a 12-month
interval for other lifting equipment, unless a written examination scheme sets a different interval.
A turbine's hoists and man-riding equipment usually sit on the 6-month interval, so Papertrail runs
each component on its own schedule rather than one fixed interval for the whole unit.

### Does LOLER cover the fall-arrest anchors on a turbine?

Not on their own. LOLER covers equipment that lifts or lowers a load, so a fall-arrest anchor whose
only job is to arrest a fall sits under the Work at Height Regulations 2005 instead. If the same
anchor is also rigged to raise or lower a person, for rescue or work positioning, LOLER applies to
that use as well. Papertrail records each anchor against whichever regulation its actual use calls for,
not a single default.

### Do you cover PSSR for pressurised components as well as LOLER and PUWER?

Yes. Where a turbine-mounted component is part of a pressure system, it needs its own written scheme
of examination under PSSR, separate from any LOLER or PUWER schedule the same turbine also runs.
Papertrail records whichever schedule and standard your written scheme sets for that specific
component, rather than assuming every unit on a turbine is inspected the same way.

### We work onshore and offshore, often with no signal. Does scanning work out there?

Yes, within a single synced account. Tag each turbine-mounted component with an NFC tag, QR code or
barcode, and its record and history are available offline once the account has synced, so a
technician can pull it up in a nacelle or on a platform with no signal. Searching across all accounts
at once needs a connection.

## One record for every turbine-mounted safety component

Book a demo and we'll walk through it with your own equipment list, or start for free and add your
first turbine-mounted components from the directory.
