The inspections get done. Proving they were done is the part that costs you.
Every EICR and PAT test on its own retest schedule
Paper EICR and PAT certificates get filed away in a cabinet by date, so proving what's current means opening every folder until you find the latest one.
The electrician who carried out the last test holds the only copy, on their own system, until someone remembers to chase them for it.
A spreadsheet tracks retest dates until whoever maintained it moves on, and the next update never comes.
PaperBuilt around the test and retest cycle
Schedule Manager
Set retest intervals per item, from a PAT-tested appliance to a fixed installation's EICR, each running as its own schedule with alerts before anything falls due.


Checklist Editor
PAT- and EICR-aligned checklists, matched against manufacturer data in the Papertrail Product Directory, or build your own with the Checklist Editor on Expert and Enterprise.
Certificates
Every test produces a shareable certificate, filed against the right item automatically.
1 of 3

Checklist Editor
Inspect
Use manufacturer-approved checklists for any equipment type, from lifting gear to PPE inspection records. Build your own with the Checklist Editor on Expert and Enterprise.
Your electrical safety records, visible to whoever needs them
PartnerHub connects your account to the organisations you work with, so they see the records you share, and every update to them, in their own workspace.
Invite
Invite the electrician who carries out your EICR, or an insurer, into a PartnerHub partnership
See
They see the live record in their own workspace, with its full test history, not a certificate emailed after the fact
Withdraw
Withdraw access at any time: they keep a read-only copy of the record as it stood, with no further updates
Every PAT test and EICR, scheduled to your intervals
The Electricity at Work Regulations 1989 don't set how often you test. That's for your competent person to decide.
In Papertrail, they can create a schedule for each type of test and apply it to every appliance and installation it covers. You're alerted before each test is due, the job goes to whoever does the testing, and the PAT result or EICR is stored against the item, ready when your insurer or an auditor asks.
- ISO 27001, British Assessment Bureau (opens cvs.babcert.com)
- LEEA Associate Member
- IRATA International Associate Member
- GetApp Category Leaders 2025, GetApp User Reviews 4.7
- Capterra Shortlist 2025, Capterra 4.7 (opens www.capterra.co.uk)
- Software Advice Front Runners 2025, Software Advice 4.7
Common questions
Will my team actually adopt it?
Papertrail is built around the inspection your team already does: scan the tag, work through the checklist, save. RWE's technicians are working in it after a half-hour session, and Hogan Group runs it across a team aged 18 to 79 on minimal training. When questions come up, our support team's average first response time is under 8 minutes.
Can you migrate us from spreadsheets or another system?
Our team handles the data migration for you, so your electrical safety register is ready to work with rather than waiting on you to key it in. We set up your folder structure, frequencies and states with you first, and help bring your existing appliance, distribution board and installation records across from a spreadsheet or your current system.
How often does an EICR need renewing?
There's no single fixed interval. The Electricity at Work Regulations 1989 set no fixed number, and the IET's own Code of Practice removed its old sample-interval table in 2020, specifically so a competent person sets it against a genuine risk assessment rather than a rule of thumb. Papertrail runs each item's retest cycle against whatever interval that assessment sets, so nothing is checked off the wrong calendar.
What are an EICR and a PAT test?
An EICR (Electrical Installation Condition Report) examines a building's fixed wiring, tested and reported against BS 7671. A PAT test examines what plugs into it instead, kettles, monitors, power tools, extension leads, on a risk-based interval rather than a fixed one. Papertrail runs each as its own schedule and checklist, so an EICR due in three years and a PAT test due next month never get checked off the same calendar.
Does Papertrail carry out the EICR or the PAT test itself?
No. Papertrail is where the record and certificate live, not who does the testing. A qualified electrician or a competent person still inspects the installation or appliance and produces the result. Papertrail schedules when that's due, stores the certificate against the right item, and alerts you before the next one falls due.
Your electrical safety register, always ready for inspection
Book a demo and we'll walk through it against your own buildings, or start for free and add your first appliance or installation.
26 million inspections recorded· No obligation.
Last reviewed on . MJB.






